Contractor Portal / Inspections

                                                                                PULLING PERMITS

SINGLE TRADE PERMITS: Please do not pull a single trade permit if you are validating on a permit. If you are not registered or do not know your code please see the "contractor registration" tab on the left hand side.
 

Plumbing permits

Electrical permits (NOT SOLAR... SOLAR CANNOT BE PULLED ONLINE)

Mechanical / HVAC permits

Roofing permits (NOT SOLAR... SOLAR CANNOT BE PULLED ONLINE)  



                                      INSPECTIONS

To request an inspection please follow your instructions on the bottom of your permit. You must have your permit to complete this process.

Requests must be in by 4:00 PM THE DAY BEFORE. There are no "Same Day" inspections except in emergencies cases determined by the Building Official.

To schedule an inspection or see your results Click here: Contractor Portal

 * We DO NOT give time frames on inspections. Our inspections are done Monday-Friday 8:00am-5:00pm.